Installation on heated and unheated cement-based screed (CT)
Firstly carry out a moisture test. The CM moisture content may not exceed 2.0 CM% for floating or unbonded screeds. Heated screeds must be commissioned beforehand. With bonded CT screeds, moisture measurements are not necessary.
PRIMING |
|
||||||||||||||||
LEVELLING |
|
||||||||||||||||
TILE INSTALLATION |
|
||||||||||||||||
GROUTING |
|