St. Antonius Church, Germany
Key Facts
布置方式:
The floor finish in the church was re-worked with our uncoupling adhesive UNIFIX-S3. The seating was partially removed, then the hollow sounding natural stone flooring was abraded, primed and new tiles bonded over the top.
建筑工程类型
翻修
物件大小:
540 m²
工作持续时间:
6 周
位置:
德国
/ Büren
建筑师:
Josef Zumdick
Fettpottweg 7
33142 Steinhausen
涂敷商:
Massimo Turco Fliese
Bentelerstr.12
33449 Langenberg