Assured balcony restoration system

Key Facts

Balkonsanierung
1
1 Levelling out voids

Close large voids with ASOCRET-M30 by trowel to thicknesses from 3 – 30 mm.

2
2 Edge insulation strips

Lay the RD-SK50 edge insulation strips at the wall/floor transition. Bond to the substrate with the self adhesive strip. Once fixed, the RD-SK50 is pressed against the wall, so that restraint or sound bridges are prevented.

Gefaellespachtelung
3 Smoothing to falls (if required)

Mix ASOCRET-M30 with the prescribed quantity of water and apply on the primed substrate up to a max. of 30 mm in one operation. To select the primer, please refer to the current, valid technical data sheet.

4
4 Priming the coved fillet

Cut the RD-SK50 edge insulation strip flush at the transition area. Prime the area where the coved fillet will be produced, with ASODUR-GBM.

5
5 Producing the coved fillet

Produce a coved fillet of edge length approx. 4 – 6 cm, with ASODUR-EMB and apply into the area freshly slurried with ASODUR-GBM, wet in wet.

6
6 Primer application

Roller apply the ASODUR-SG3 without pinholes, evenly in a criss-cross manner.

7
7 Flowing coat

ASODUR-EB/L is applied in one coat to a thickness of approx. 2 mm with a rake.